A string is a group of solar modules wired in series. The string voltage has to stay inside the inverter's limits in the coldest and hottest weather. Too many modules and a cold morning can push the voltage past the inverter's absolute maximum. Too few and a hot afternoon can drop it below the point where the inverter tracks the maximum power point. This article shows how to find the minimum and maximum string length.
Key terms
- Voc: open-circuit voltage of one module at standard test conditions (STC, 25 °C cell temperature), in V.
- Vmp: voltage of one module at maximum power at STC, in V.
- Temperature coefficient: the change in voltage per degree, in %/°C. It is negative: voltage rises when cells get colder and falls when they get hotter.
- Inverter Vmax: the absolute maximum DC input voltage, in V.
- MPPT window: the DC voltage range where the inverter tracks maximum power, from Vmppt,min to Vmppt,max, in V.
Formulas
- Cold Voc: Voc,cold = Voc × (1 + β × (Tmin − 25) ÷ 100), with β the coefficient in %/°C and Tmin the lowest expected cell temperature in °C.
- Hot Vmp: Vmp,hot = Vmp × (1 + γ × (Tmax − 25) ÷ 100), with γ the Vmp coefficient and Tmax the highest expected cell temperature.
- Maximum modules per string: Nmax = floor(Vmax ÷ Voc,cold). Round down.
- Minimum modules per string: Nmin = ceil(Vmppt,min ÷ Vmp,hot). Round up.
Assumptions
- The module datasheet values and the temperature coefficients are used as given. If the datasheet gives a separate Vmp coefficient, use it. If it does not, the Voc coefficient is a common approximation.
- The lowest and highest cell temperatures come from local design data. Cell temperature on a hot day is well above the air temperature.
- Modules in a string are the same model and see the same sun and orientation.
Worked example
Module: Voc = 49.5 V, Vmp = 41.5 V, Pmax = 550 W, Voc coefficient −0.28 %/°C, Vmp coefficient −0.36 %/°C.
Inverter: Vmax = 1000 V, MPPT window 200 V to 800 V.
Site: lowest cell temperature −5 °C, highest cell temperature 70 °C.
Cold Voc: 49.5 × (1 + (−0.28) × (−5 − 25) ÷ 100) = 49.5 × 1.084 = 53.66 V.
Maximum string: 1000 ÷ 53.66 = 18.64, so Nmax = 18 modules. Check: 18 × 53.66 = 965.8 V, below 1000 V. Nineteen modules would give 1019.5 V, which is over the limit.
Hot Vmp: 41.5 × (1 + (−0.36) × (70 − 25) ÷ 100) = 41.5 × 0.838 = 34.78 V.
Minimum string: 200 ÷ 34.78 = 5.75, so Nmin = 6 modules. At 70 °C, 6 modules give 208.7 V, just above the 200 V lower limit.
Choice: any string from 6 to 18 modules fits. With 18 modules, the hot Vmp is 18 × 34.78 = 626.0 V, well inside the 200 V to 800 V window, and the string power is 18 × 550 = 9900 W (9.9 kW at STC).
Limitations
This method checks voltage only. You must also check the inverter's maximum input current per MPPT input against the module short-circuit current, the DC to AC ratio, cable voltage drop, and the voltage and current limits of the DC cables and protection. Some designers add a safety margin to the cold voltage, and some codes require a specific method such as an ASHRAE temperature value for the site. Use the datasheets and the local code, and have the design reviewed by a qualified installer.
Try the calculators