Detention Pond Storage Calculator


Preliminary detention storage from a triangular design hydrograph and a constant allowable release rate: the volume the pond must hold while inflow exceeds outflow.

Triangular hydrograph: peak Qp with total base time tb. Release assumed constant.

Enter your values:
Results:

How it works

With a triangular inflow hydrograph (peak Qₚ, base time tₐ) and a constant release Qₒ, storage builds from the moment inflow exceeds Qₒ until it falls back below it:

V = ½ × tₐ × Qₚ × (1 − Qₒ/Qₚ)²

Worked example

Peak inflow 2.4 m³/s, base time 2 h, allowable release 0.8 m³/s: V = 0.5 × 7200 × 2.4 × (1 − 1/3)² = 8640 × 0.4444 = 3840 m³ (about 0.38 hectare-meters).

Assumptions and limitations

  • Constant release approximates an orifice or weir whose flow actually varies with head; real routing (level-pool) usually needs 5-15% less storage.
  • Use the design storm the authority specifies and add freeboard.