OEE Calculator (Overall Equipment Effectiveness)


Overall Equipment Effectiveness from its three factors: availability (run time vs planned time), performance (actual vs ideal rate) and quality (good vs total parts).

Enter the planned time, downtime, ideal cycle time and the part counts for the same period.

Inserisci i valori:
min
min

All stops within the planned time.

s / part
Risultati:
%
%
%
%

How it works

OEE = Availability × Performance × Quality, where Availability = run time / planned production time, Performance = (ideal cycle time × total count) / run time, and Quality = good count / total count.

  • Use consistent rules for what counts as planned time and as downtime.
  • Performance above 100% means the ideal cycle time or the counts are wrong - check the data rather than capping the number.
  • OEE is a KPI framework, not a material property; verify the conventions your plant uses (e.g. ISO 22400).

Standard industry OEE definition; apply your company's time and count conventions.