Kt/V Dialysis Adequacy Calculator (Daugirdas)


Measure hemodialysis adequacy with the Daugirdas second-generation single-pool Kt/V from pre- and post-dialysis urea, session length, ultrafiltration and weight.

Enter the session data and click Calculate.

Insira os valores:
mg/dL
mg/dL
Resultados:
%

What this calculator is and when it is used

Kt/V is the standard measure of hemodialysis dose: dialyzer urea clearance (K) times session length (t), divided by the patient's urea distribution volume (V). The Daugirdas second-generation formula estimates single-pool Kt/V from the pre- and post-dialysis urea ratio, correcting for urea generation during the session and for ultrafiltration.

Use it for thrice-weekly maintenance hemodialysis when you have a correctly drawn post-dialysis urea (slow-flow or stop-pump technique) and the session's ultrafiltration volume. The post-sample technique matters: early or poorly drawn samples overstate Kt/V.

What you need to enter

  • Pre-dialysis BUN and post-dialysis BUN: from the same session. Any unit works, because only the ratio is used, as long as both share it.
  • Session length: in hours (or minutes; the unit box converts).
  • Ultrafiltration volume: the fluid removed, in L or mL.
  • Post-dialysis weight in kg or lb.

How to read the result

ResultWhat it usually means and the next consideration
Below 1.2Below the KDOQI minimum for thrice-weekly dialysis. Next: check sampling technique first, then review needle placement, access function, time and dialyzer before increasing the prescription.
1.2 to 1.4Meets the minimum (1.2) but not the 1.4 target that guidelines recommend aiming for, so the minimum is reliably achieved. Consider increasing the delivered dose.
1.4 or moreMeets the KDOQI 2015 target for thrice-weekly schedules. Higher is not automatically better; very high values can reflect a shrinking patient volume.

Formula

spKt/V = -ln(R - 0.008 x t) + (4 - 3.5 x R) x UF/W, where R = post-BUN / pre-BUN, t = session length in hours, UF = ultrafiltration in liters and W = post-dialysis weight in kg.

Worked example

Pre-BUN 70 mg/dL, post-BUN 25 mg/dL, a 4-hour session, 2 L removed and 70 kg: R = 0.357, so spKt/V = -ln(0.357 - 0.032) + (4 - 1.25) x 2/70 = 1.12 + 0.08 = 1.20, just at the minimum.

Limitations

  • Single-pool Kt/V ignores the post-dialysis urea rebound; equilibrated Kt/V (eKt/V) is lower and is preferred for short or high-efficiency sessions.
  • Wrong results follow wrongly drawn samples: the post-BUN must use the slow-flow or stop-dialysate technique.
  • A dose target for standard thrice-weekly schedules; daily or nocturnal schedules use different adequacy measures.

Reference

  • Daugirdas JT. Second generation logarithmic estimates of single-pool variable volume Kt/V: an analysis of error. J Am Soc Nephrol 1993;4(5):1205-1213. doi:10.1681/ASN.V451205
  • National Kidney Foundation. KDOQI clinical practice guideline for hemodialysis adequacy: 2015 update. Am J Kidney Dis 2015;66(5):884-930.

Disclaimer. Medical information only. This calculator is an educational aid for clinicians and students. It does not give medical advice, diagnosis or treatment, and it does not replace clinical judgment. Check results against the original source and local protocols before using them in patient care.

KDOQI 2015 final guideline, section 3

Daugirdas, original second-generation Kt/V study