Concrete Calculator (Slab, Footing, Column — Yards, Bags, Cost)


Concrete volume for slabs, footings and round columns in cubic yards or cubic metres, with 60 lb and 80 lb bag counts, a waste allowance and an optional cost estimate from your price per yard.

Enter the dimensions of the pour. Depth is usually a few inches - pick the unit you measured in.

Slab / flatwork

Enter your values:
Results:

How it works

Volume = length × width × depth for slabs and footings, and πr²h for round columns. The waste allowance scales the volume up before bag counts are rounded up to whole bags.

  • One 80 lb bag yields about 0.60 ft³ (0.017 m³); a 60 lb bag about 0.45 ft³ (0.013 m³). One cubic yard is 27 ft³, roughly 45 bags of 80 lb.
  • Order ready-mix by the cubic yard (minimum loads often apply); bags suit pours under about 1 yd³.
  • Typical thicknesses: 4 in for patios and walkways, 5-6 in for driveways, footings per local code.

Estimates for ordering, not structural design. For structural slabs and footings, have the thickness and reinforcement checked by a qualified engineer.