Overall Equipment Effectiveness (OEE) is the standard way to measure how well a machine or line uses its planned production time. It compresses three questions into one score: how much of the time did we actually run, how fast did we run compared with the ideal rate, and how much of what we made was good? OEE is the product of those three factors.
The three factors
| Factor | Formula | What it captures |
|---|---|---|
| Availability | run time ÷ planned production time | Stops: breakdowns, changeovers, material shortages |
| Performance | (ideal cycle time × total count) ÷ run time | Slow running: small stops, reduced speed |
| Quality | good count ÷ total count | Defects: scrap and rework, including startup rejects |
OEE = Availability × Performance × Quality. Because the factors multiply, a weakness in any one of them drags the whole score down.
Definitions and units
- Planned production time: the time the machine is scheduled to run, in minutes. Shift length minus planned stops such as breaks and scheduled maintenance.
- Run time: planned production time minus unplanned stops, in minutes.
- Ideal cycle time: the fastest sustainable time per part for this product on this machine, in seconds.
- Total count: everything produced in the run time, good and bad. Good count: parts that pass without rework.
Assumptions
- Planned stops (breaks, planned maintenance, no orders) are excluded from planned production time; unplanned stops are not.
- The ideal cycle time is the design or best demonstrated rate, not the nameplate maximum the product cannot actually run at.
- Reworked parts count as not good on first pass; count them consistently with your plant's convention.
Worked example: one shift on a molding machine
Given: an 8-hour shift (480 minutes) with 30 minutes of planned breaks, so planned production time is 450 minutes. Unplanned stops (a blockage and a material wait) total 47 minutes, giving run time of 403 minutes. The ideal cycle time is 1.5 s per part, and the machine produced 15,000 parts, of which 14,550 passed first time.
Step 1, availability: 403 ÷ 450 = 0.896, or 89.6 percent.
Step 2, performance: (1.5 × 15,000) ÷ (403 × 60) = 22,500 ÷ 24,180 = 0.931, or 93.1 percent.
Step 3, quality: 14,550 ÷ 15,000 = 0.970, or 97.0 percent.
Step 4, OEE: 0.896 × 0.931 × 0.970 = 0.808, or 80.8 percent.
Step 5, what it means: at a perfect 100 percent the shift would have made 450 × 60 ÷ 1.5 = 18,000 good parts. It made 14,550, and 14,550 ÷ 18,000 = 80.8 percent, the same answer. OEE is exactly the share of perfect production the shift achieved.
Quick lesson: the biggest loss here is availability: 47 minutes of unplanned stops. Fixing that single issue moves the score more than any other lever in this example.
How to read the score
A score of 85 percent is widely treated as world-class for discrete manufacturing. Many plants run between 60 and 75 percent. The score matters less than the trend and the loss breakdown: track OEE by shift and by loss reason, and attack the largest loss first. A single OEE number with no loss detail is a missed opportunity.
Limitations
OEE measures one machine or line, not a factory. Comparing OEE across different products or machines is unreliable because ideal cycle times and quality bars differ. The score hides where losses sit unless the underlying events are logged, and it says nothing about whether the parts made were the parts needed. Variants exist: TEEP counts all calendar time, and OPE or OAE adapt the idea for whole plants. Use OEE as a shop-floor improvement tool, not a league table.
Try the calculators
- OEE Calculator for availability, performance, quality and the combined score.
- Injection Molding Cycle Time Calculator for the cycle time behind the performance factor.
- Injection Molding Cost Calculator for the cost side of output.