Injection Molding Cycle Time Calculator
Total cycle time from its phases, theoretical output in parts per hour, and good-parts output after availability and quality yield.
Enter the seconds for each phase (leave non-occurring phases empty), the cavity count, availability and yield.
How it works
Cycle time = close + fill + pack/hold + cooling + open/eject (adjust for overlapping stages). Parts/hour = 3600 × cavities / cycle time. Good parts/hour = parts/hour × availability × quality yield.
- Do not double-count operations that overlap - for example screw recovery usually happens during cooling, so it is not extra time.
- Cooling is usually the largest phase; estimate it with the Cooling Time Calculator.
- Availability is run time / planned production time; yield is good parts / total parts.
Production arithmetic per the DFMA injection moulding cost-estimating guide.